Filing Log

January February March April
May June July August
September October November December

September 2008

The documents are listed by date, docket number(s), (number of copies filed),
NAME OF DOCUMENT , and a description 

09/02/08
07-035-93
(5) ROCKY MOUNTAIN POWER’S PETITION FOR RECONSIDERATION In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year and for Approval of a New Large Load Surcharge

09/02/08
07-035-93
(5) NOTICE OF APPEARANCE OF ATTORNEY LICENSED IN A FOREIGN STATE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/02/08
07-035-93
(5) APPENDIX A, Re: Victoria R. Mandell

09/02/08
08-999-02
Re: 03-035-14
(8) COMMENTS FROM DPU In the Matter of the Miscellaneous Electric Utility Correspondence and Reports Docket

09/02/08
08-049-29
(1) APPENDIX A AND APPENDIX B, Re: Alex Duarte, Carla Butler, James Farr, Robert Brigham, Carolyn Hammack, Candace Mowers, David Ziegler

09/02/08
08-2490-01
(1) APPENDIX A, Re: Florence Vincent, Matthew F. McNulty, Mary Jane E. Wagg

09/02/08
NA
(1) NOTICE BY NOVATEL LTD., INC. OF INTENT TO RESELL SERVICE In the Matter of the Miscellaneous Telecommunications Docket

09/02/08
08-999-04
(1) STATE CERTIFICATION OF MANTI TELEPHONE COMPANY, INC. In the Matter of the State Certification of Rural Carriers’ Compliance with 47 U.S.C. Section 254(e)

09/02/08
08-999-04
(1) STATE CERTIFICATION OF SOUTH CENTRAL UTAH TELEPHONE ASSOCIATION In the Matter of the State Certification of Rural Carriers’ Compliance with 47 U.S.C. Section 254(e)

09/02/08
07-2477-01
(2) REPORTER’S TRANSCRIPT, Re: August 13, 2008 In the Matter of the Application of Eagle’s Landing Water Company, LLC, for a Certificate of Public Convenience and Necessity to Operate as a Public Utility Rendering Culinary Water Service, or for an Exemption from Public Service Commission Regulation

09/02/08
08-049-46
(1) FILING OF AMENDMENT TO AGREEMENT In the Matter of the Interconnection Agreement Between Qwest Corporation and MCImetro Access Transmission Services, LLC

09/02/08
07-035-93
(1) ROCKY MOUNTAIN POWER PRESS RELEASE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/02/08
08-049-47
(1) FILING OF AMENDMENT TO AGREEMENT In the Matter of the Interconnection Agreement between Qwest Corporation and Union Telephone Company

09/02/08
08-2263-01
(2) REPORTER’S TRANSCRIPT, Re: August 13, 2008 In the Matter of the Formal Complaint of A-Allstate Bonding Company Against Eschelon Telecom, Inc. / Integra Telecom

09/03/08
07-035-93
(15) REBUTTAL TESTIMONY AND EXHIBITS OF THE KROGER CO. In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/03/08
07-035-93
(15) PRE-FILED REBUTTAL COST-OF-SERVICE TESTIMONY OF DANIEL E. GIMBLE FOR THE COMMITTEE OF CONSUMER SERVICES In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/03/08
07-035-93
(15) ROCKY MOUNTAIN POWER’S COST OF SERVICE REBUTTAL TESTIMONY AND EXHIBITS In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/03/08
07-035-93
(5) REBUTTAL TESTIMONY OF MAURICE BRUBAKER In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/03/08
07-035-93
(15) PREFILED REBUTTAL TESTIMONY OF KEVIN C. HIGGINS In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/03/08
07-035-93
(1) PUBLIC COMMENT EMAIL FROM L. WILSON In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/03/08
07-035-93
(15) REBUTTAL TESTIMONY OF RICHARD COLLINS In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/03/08
07-035-93
(8) REBUTTAL TESTIMONY OF ABDINASIR M. ABDULLE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/03/08
08-2476-01
(5) UBTA-UBET COMMUNICATIONS, INC.’S MOTION TO INTERVENE AND MOTION TO DISMISS PETITIONS In the Matter of the Application of the Petitions of Bresnan Broadband of Utah, LLC, to Resolve Dispute Over Interconnection of Essential Facilities and for Arbitration to Resolve Issues Relating to an Interconnection Agreement with UBTA-UBET Communications, Inc.

09/03/08
08-2490-01
(1) COMMENTS FROM THE BUREAU OF LAND MANAGEMENT In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor II, LLC, for Certificates of Convenience and Necessity for the Milford Phase I and Phase II Wind Power Projects

09/03/08
07-999-08
(1) PUBLIC COMMENTS FROM G. WHIPPLE In the Matter of the Investigation into Net Metering

09/03/08
08-2263-01
(1) CORRESPONDENCE FROM INTEGRA TELECOM In the Matter of the Formal Complaint of A-Allstate Bonding Company Against Eschelon Telecom, Inc. dba Integra Telecom

09/03/08
08-057-11
(1) PUBLIC COMMENT FROM B. HURD In the Matter of the Investigation and the Consolidation of Dockets of the Formal Complaints Against Questar Gas Company Relating to Back-Billing

09/04/08
07-057-04
(5) SETTLEMENT STIPULATION In the Matter of the Request of the Division of Public Utilities for Enforcement Action under the Natural Gas Pipeline Safety Act Against Questar Gas Company

09/04/08
08-049-42
(8) COMMENTS FROM DPU In the Matter of the Request by Qwest Corporation for a Waiver of the Threshold Requirements to Provide 1 (One) Thousand Block for a Qwest Customer in the St. George Rate Center

09/04/08
07-035-94
(8) COMMENTS FROM DPU In the Matter of the Application of PacifiCorp, by and through its Rocky Mountain Power Division, for Approval of a Solicitation Process for a Flexible Resource for the 2012-2017 Time Period, and for Approval of a Significant Energy Resource Decision

09/04/08
08-2490-01
(5) MOTION TO COMPEL RESPONSES FROM UAMPS TO MILFORD WIND’S SECTION AND THIRD SETS OF DATA REQUESTS AND REQUEST FOR HEARING In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for Certificates of Convenience and Necessity for the Milford Phase I and Phase II Wind Power Project

09/04/08
08-999-02
Re: 07-035-16
(5) QUARTERLY FINANCING ACTIVITY REPORT In the Matter of the Application of Rocky Mountain Power for an Exemption under Subsection 54-4-31 (4) of the Utah Code Annoted

09/04/08
07-035-93
(1) PUBLIC COMMENT EMAIL FROM D. OSBORNE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/04/08
07-999-08
(1) PUBLIC COMMENT EMAIL FROM THE PARKERS In the Matter of the Investigation into Net Metering

09/08/08
08-2490-01
(1) REDACTED PRE-FILED REBUTTAL TESTIMONY OF JONI S. ZENGER In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor II, LLC, for Certificates of Convenience and Necessity for the Milford Phase I and Phase II Wind Power Project

09/08/08
08-035-38
(5) RESPONSE OF THE DIVISION OF PUBLIC UTILITIES TO THE ROCKY MOUNTAIN POWER AUGUST 28, 2008 FILING RESPONDING TO MOTIONS TO DISMISS OR TO RESTART THE 240-DAY STATUTORY TIME PERIOD In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations

09/08/08
08-035-38
(5) ROCKY MOUNTAIN POWER’S REPLY TO UIEC’S OPPOSITION TO ROCKY MOUNTAIN POWER’S MOTION FOR APPROVAL OF TEST-PERIOD In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations

09/08/08
08-035-38
(5) UAE INTERVENTION GROUP’S REPLY MEMORANDUM IN SUPPORT OF ITS MOTION FOR DETERMINATION THAT ROCKY MOUNTAIN POWER’S APPLICATION AND SCHEDULES ARE INCOMPLETE AND INADEQUATE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations

09/08/08
08-035-38
(5) UTAH COMMITTEE OF CONSUMER SERVICES’ REPLY TO ROCKY MOUNTAIN POWER’S AUGUST 28, 2008 RESPONSE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations

09/08/08
07-035-93
(5) ROCKY MOUNTAIN POWER’S WITHDRAWAL OF PORTION OF PETITION FOR RECONSIDERATION ON RETURN ON EQUITY In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/08/08
08-035-38
(5) UIEC’S REPLY MEMORANDUM IN SUPPORT OF UIEC’S MOTION TO DISMISS THE APPLICATION OF ROCKY MOUNTAIN POWER In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations

09/08/08
08-2490-01
(5) TESTIMONY OF MIKE R. VALARDE In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for Certificates of Public Convenience and Necessity for Phase I and Phase II of the Milford Wind Power Project

09/08/08
07-035-93
(1) UTAH ASSOCIATION OF ENERGY USERS AND UTAH INDUSTRIAL ENERGY USERS PRESS RELEASE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/08/08
08-2501-01
(15) APPLICATION In the Matter of the Petition of BLC Management LLC, d/b/a Angles Communication Solutions for Authority to Compete as a Telecommunications Corporation and to Offer Public Local Exchange and Interexchange Telecommunications Services

09/08/08
08-999-01
(8) COMMENTS FROM DPU In the Matter of the 2008 Lifeline, Universal Service and Speech/Hearing Impaired Funds Status

09/08/08
08-035-42
(1) REPORTER’S TRANSCRIPT, Re: August 26, 2008 IN the Matter of the Application of Rocky Mountain Power for a Certificate of Convenience and Necessity Authorizing Construction of the Populus-to-Terminal 345 kV Transmission Line Project

09/09/08
08-057-11
(5) REPLY COMMENTS OF QUESTAR GAS COMPANY REGARDING THE DIVISION OF REPORT ON TRANSPONDER PRE-DIVIDE EXCEPTIONS AND BACK-BILING ISSUES In the Matter of the Investigation and the Consolidation of Dockets of the Formal Complaints Against Questar Gas Company Relating to Back-Billing

09/09/08
08-057-11
(5) COMMENTS IN RESPONSE TO THE 18 JULY 2008 REPORT OF THE UTAH DIVISION OF PUBLIC UTILITIES In the Matter of the Investigation and the Consolidation of Dockets of the Formal Complaints Against Questar Gas Company Relating to Back-Billing

09/09/08
08-057-11
(5) COMMENTS OF SALT LAKE COMMUNITY ACTION PROGRAM In the Matter of the Investigation and the Consolidation of Dockets of the Formal Complaints Against Questar Gas Company Relating to Back-Billing

09/09/08
07-999-06
(1) PUBLIC COMMENT FROM A. MITCHELL In the Matter of the Investigation of Net Metering

09/10/08
08-057-11
(8) COMMENTS FROM THE COMMITTEE OF CONSUMER SERVICES In the Matter of the
Investigation and the Consolidation of Dockets of the Formal Complaints Against Questar Gas Company Relating to Back-Billing

09/10/08
08-035-38
(15) SUPPLEMENTAL DIRECT TESTIMONY AND EXHIBITS OF ROCKY MOUNTAIN POWER In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations

09/10/08
08-2490-01
(5) MEMORANDUM IN OPPOSITION TO MOTION TO COMPEL RESPONSES FROM UAMPS TO MILFORD WIND’S SECOND AND THIRD SET OF DATA REQUESTS IN the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for Certificates of Public Convenience and Necessity for Phase I and Phase II of the Milford Wind Power Project

09/10/08
07-2035-01
(5) COMMENTS FROM CCS In the Matter of the Acknowledgment of PacifiCorp’s Integrated Resource Plan of 2007

09/10/08
07-2035-01
(8) COMMENTS FROM DPU In the Matter of the Acknowledgment of PacifiCorp’s Integrated Resource Plan of 2007

09/10/08
07-2035-01
(5) COMMENTS OF WESTERN RESOURCE ADVOCATES, UTAH CLEAN ENERGY AND THE SOUTHWEST ENERGY EFFICIENCY PROJECT ON PACIFICORP’S 2007 IRP UPDATE IN the Matter of the Acknowledgment of PacifiCorp’s Integrated Resource Plan of 2007

09/10/08
08-2498-01
(8) COMMENTS FROM DPU In the Matter of the Application of Canaan Springs Water Company for a Certificate of Public Convenience and Necessity

09/10/08
08-999-04
(1) STATE CERTIFICATION OF EMERY TELCOM, CARBON/EMERY TELCOM, INC., AND HANKVILLE TELCOM, INC. In the Matter of the State Certification of Rural Carriers’ Compliance with 47 U.S.C. Section 245(e); 2008

09/10/08
08-035-72
(1) COMMENTS FROM DPU IN the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Jewell

09/10/08
08-035-73
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Bingham

09/10/08
08-035-74
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Mortensen

09/10/08
08-035-75
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Isakson

09/10/08
08-035-76
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Benally

09/10/08
08-2476-02
(8) COMMENTS FROM DPU In the Matter of the Petitions of Bresnan Broadband of Utah, LLC, to Resolve Dispute Over Interconnection of Essential Facilities and for Arbitration to Resolve Issues Relating to an Interconnection Agreement with UBTA-UBET Communications, Inc.

09/11/08
08-035-71
(1) FORMAL COMPLAINT In the Matter of the Formal Complaint of Reynolds Against Rocky Mountain Power

09/11/08
08-049-48
(1) REQUEST FOR WAIVER In the Matter of the Request from Qwest Corporation for a Waiver to Allow the PA/NeuStar, the Number Pooling Administrator, to Provide 2 Thousands Blocks in the Springville Rate Center

09/11/08
08-2490-01
(5) REQUEST FOR CLARIFICATION In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for Certificates of Convenience and Necessity for the Milford Phase I and II Wind Power Project

09/11/08
07-999-08
(1) CONSUMER PETITION FOR MORE GRID-TIED SOLAR POWER IN UTAH In the Matter of the Investigation of Net Metering

09/11/08
08-R360-01
(5) PETITION FOR RULE CHANGE IN the Matter of the Utah Rural Telecom Association’s Petition for a Rule to Amend the Definition of Basic Telecommunications Service in Utah Admin. Code R746-360-2 C

09/11/08
08-2499-01
(5) APPLICATION AMENDMENT In the Matter of the Application of Maskina Communications, Inc., f/k/a Transcom Communications, Inc., for Authority to Provide Facilitites-Based Interexchange Telecommunications Services in the State of Utah

09/11/08
08-999-07
(5) PETITION TO INTERVENE OF THE UTAH RURAL TELECOM ASSOCIATION AND ASSOCIATION MEMBERS In the Matter of the Investigation into the Rules, Standards, or Procedures Other States Have Adopted to Ensure Safe, Reliable and Adequate Utility Service and Facilities

09/11/08
08-999-02
(1) PACIFICORP’S FORM 10-Q In the Matter of the Miscellaneous Electric Utility Correspondence and Reports Docket

08/11/08
08-049-01
(1) SEPTEMBER PAYMENTS In the Matter of the 2008 Qwest Performance Assurance Plan (QPAP)

09/15/08
08-057-20
(5) ANSWER OF QUESTAR GAS COMPANY In the Matter of the Formal Complaint of U.S. Magnesium Against Questar Gas Company

09/15/08
07-999-01
(1) PUBLIC COMMENT EMAIL FROM N. BARTON In the Matter of the Matter of the Petition for (801) Area Code Overlay & Abrogation and Recision of 801 Area Code Split Order

09/15/08
07-999-09
(8) COMMENTS FROM DPU In the Matter of the Utah Rural Telecom Association’s Petition for a Rule on Capital Structure; R746-361

09/15/08
08-999-04
(8) COMMENTS FROM DPU In the Matter of the State Certification of Rural Carriers’ Compliance with 47 U.S.C. Section 245(e)

09/15/08
08-049-36
(8) COMMENTS FROM DPU In the Matter of the Interconnection Agreement Between Qwest Corporation and Clertech.com

09/15/08
08-049-35
(8) COMMENTS FROM DPU In the Matter of the Interconnection Agreement Between Qwest Corporation and Elevoi Communications, LLC

09/15/08
08-049-37
(8) COMMENTS FROM DPU In the Matter of the Interconnection Agreement Between Qwest Corporation and Global Crossing Local Services, Inc.

09/15/08
08-049-01
(1) STATEMENT OF ACCOUNT AS OF AUGUST 31, 2008 In the Matter of the 2008 Qwest Performance Assurance Plan (QPAP)

09/15/08
08-999-02
(15) ASSESSMENT OF LONG-TERM SYSTEM-WIDE POTENTIAL FOR DEMAND-SIDE AND OTHER SUPPLEMENTAL RESOURCES In the Matter of the Miscellaneous Electric Utility Correspondence and Reports Docket

09/16/08
08-035-38
(1) APPENDIX A, Re: Gary L. Cox, Byron Nielsen, Arthur Sandack

09/16/08
08-2263-01
(1) CORRESPONDENCE FROM INTEGRA TELECOM In the Matter of the Formal Complaint of A-Allstate Bail Bonding Against Eschelon Telecom, Inc., d/b/a Integra Telecom

09/16/08
08-035-77
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Allred

09/17/08
07-035-93
(8) RESPONSE OF THE DIVISION OF PUBLIC UTILITIES TO THE REQUEST FOR RECONSIDERATION FILED BY ROCKY MOUNTAIN POWER In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of $161.2 Million per Year, and for Approval of a New Large Load Surcharge

09/17/08
07-035-93
(5) UAE INTERVENTION GROUP’S RESPONSE TO ROCKY MOUNTAIN POWER COMPANY’S PETITION FOR RECONSIDERATION POWER In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of $161.2 Million per Year, and for Approval of a New Large Load Surcharge

09/17/08
07-035-93
(5) UTAH COMMITTEE OF CONSUMER SERVICES’ RESPONSE TO PETITION FOR RECONSIDERATION In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of $161.2 Million per Year, and for Approval of a New Large Load Surcharge

09/17/08
07-035-22
(5) RESPONSE OF ROCKY MOUNTAIN POWER TO HEBER LIGHT & POWER COMPANY’S MOTION TO DISMISS FOR LACK OF SUBJECT MATTER JURISDICTION In the Matter of the Complaint of Rocky Mountain Power, a Division of PacifiCorp, Against Heber Light & Power Regarding Unauthorized Service by Heber Light & Power in Areas Certificated to Rocky Mountain Power

09/17/08
07-035-93
(5) RESPONSE OF UIEC, AN INTERVENTION GROUP, TO ROCKY MOUNTAIN POWER’S PETITION FOR RECONSIDERATION In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million per Year, and for Approval of a New Large Load Surcharge

09-17-08
08-057-21
(1) PUBLIC COMMENT EMAIL FROM A. SCOTSON In the Matter of the Investigation of Questar Gas Company’s Services Associated with Natural Gas Vehicles
09/18/08
08-999-03
(8) COMMENTS FROM DPU, Re: Questar Gas Dividend Declaration Aug. 12, 2008 In the Matter of the Miscellaneous Gas Docket

09/18/08
08-049-48
(8) COMMENTS FROM DPU In the Matter of the Request by Qwest Corporation for a Waiver of the Utilization Threshold Requirements, to Allow PA/NeuStar, the Number-Pooling Administrator, to Provide 2 Thousand Blocks for the Springville Rate Center

09/18/08
08-2476-01
(5) RESPONSE OF BRESNAN BROADBAND OF UTAH, LLC, TO UBTA-UBET COMMUNICATIONS, INC.’S MOTION TO DISMISS PETITIONS In the Matter fo the Petitions of Bresnan Broadband of Utah, LLC, to Resolve Dispute over Interconnection of Essential Facilities and for Arbitration to Resolve Issues Relating to an Interconnection Agreement with UBTA-UBET Communications, Inc.

09/18/08
08-049-49
(1) FILING OF INTERCONNECTION AGREEMENT In the Matter of the Interconnection Agreement between Qwest Corporation and Broadband Dynamics, LLC

09/18/08
NA
(1) CONTACT INFORMATION UPDATE, Re: Interlaken Mutual Water Company In the Matter of the Miscellaneous Water Docket

09/22/08
08-2500-01
(5) AMENDED APPLICATION In the Matter of the Application of TeleQuality Communications, Inc., for a Certificate of Public Convenience and Necessity to Provide Resold and Facilities-Based Intrastate Interexchange and Non-Switched Local Exchange Telecommunications Services Within the State of Utah

09/22/08
08-999-02
Re: 05-035-54
(5) COMMITMENT 12 In the Matter of the Miscellaneous Electric Utility Correspondence and Reports Docket

09/22/08
07-057-13
(8) PRE-FILED REBUTTAL TESTIMONY OF MARLIN BARROW In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

09/22/08
07-999-08
(1) CONSUMER PETITION FOR MORE GRID-TIED SOLAR POWER IN UTAH In the Matter of the Investigation into Net Metering

09/22/08
07-057-13
(10) PREFILED REBUTTAL TESTIMONY OF KEVIN C. HIGGINS In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

09/22/08
07-057-13
(15) REBUTTAL TESTIMONY OF CHARLES E. JOHNSON In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

09/22/08
07-057-13
(15) PRE-FILED REBUTTAL TESTIMONY OF DAVID E. DISMUKES In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

09/22/08
07-057-13
(15) COST OF SERVICE REBUTTAL TESTIMONY OF ROGER J. BALL In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

09/22/08
07-057-13
(15) QUESTAR GAS REBUTTAL TESTIMONY AND EXHIBITS In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

09/22/08
08-2490-01
(5) MOTION FOR ORDER GRANTING MILFORD WIND CORRIDOR PHASE I, LLC, AND MILFORD WIND CORRIDOR PHASE II, LLC, EXEMPTIONS FROM CERTAIN REGULATORY REQUIREMENTS In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for Certificates of Convenience and Necessity for the Milford Phase I and Phase II Wind Power Project

09/22/08
08-2490-01
(15) SUR-REBUTTAL TESTIMONY OF PAUL GAYNOR In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for Certificates of Convenience and Necessity for the Milford Phase I and Phase II Wind Power Project

09/22/08
08-2490-01
(15) SUR-REBUTTAL TESTIMONY OF LARRY HENRIKSEN In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for Certificates of Convenience and Necessity for the Milford Phase I and Phase II Wind Power Project

09/22/08
08-2490-01
(15) SUR-REBUTTAL TESTIMONY OF KRISTA KISCH In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for Certificates of Convenience and Necessity for the Milford Phase I and Phase II Wind Power Project

09/22/08
08-049-51
(1) AGREEMENT FILING In the Matter of the Interconnection Agreement Between Qwest Corporation and Broadband Dynamics, LLC

09/23/08
08-057-11
(5) MOTION FOR A CONTINUANCE In the Matter of the Investigation and the Consolidation of Dockets of the Formal Complaints Against Questar Gas Company Related to Back-Billing

09/23/08
08-049-29
(1) CORRESPONDENCE FROM INTEGRA TELECOM OF UTAH, INC., AND XO COMMUNICATIONS SERVICES, INC. In the Matter of the Qwest Corporation Petition for Commission Approval of 2008 Additions to Non-Impaired Wire Center List

09/23/08
07-035-93
(1) EMAILS TO THE GOVERNOR’S OFFICE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of $161.2 Million per Year, and for Approval of a New Large Load Surcharge

09/23/08
08-049-50
(5) PETITION TO OPEN A SIX-MONTH REVIEW UNDER SECTION 16.1 OF THE UTAH PERFORMANCE ASSURANCE PLAN In the Matter of Qwest Corporation’s Petition to Open a Six-Month Review Under Section16.1 of the Utah Performance Assurance Plan

09/23/08
08-2488-01
(8) COMMENTS FROM DPU In the Matter of the application of Access Point, Inc. for a Certificate of Public Convenience and Necessity to Provide Resold and Facilities Based Local Exchange Services within the State of Utah

09/23/08
NA
(1) NOTICE OF INTENT TO RESELL SERVICES, Re: Alliance Global Networks, LLC In the Matter of the Miscellaneous Telecommunications Docket

09/24/08
08-049-29
(5) QWEST’S RESPONSE, Re: EFFECTIVE DATE FOR DRAPER WIRE CENTER In the Matter of the Qwest Corporation Petition for Commission Approval of 2008 Additions to Non-Impaired Wire Center List

09/24/08
07-057-13
(15) REVISED EXHIBIT H OF QUESTAR REBUTTAL TESTIMONY In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

09/24/08
07-035-93
(8) PREFILED SURREBUTTAL TESTIMONY OF KEVIN C. HIGGINS In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/24/08
07-035-93
(8) PREFILED SURREBUTTAL TESTIMONY OF STEVE W. CHRISS In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/24/08
07-035-93
(15) PRE-FILED SURREBUTTAL COST-OF-SERVICE TESTIMONY OF DANIEL E. GIMBLE FOR THE COMMITTEE OF CONSUMER SERVICES In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/24/08
07-035-93
(15) SURREBUTTAL TESTIMONY OF MAURICE BRUBAKER ON BEHALF OF THE UIEC In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/24/08
07-035-93
(15) SURREBUTTAL TESTIMONY OF CHARLES E. JOHNSON In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/24/08
07-035-93
(8) SUR-REBUTTAL TESTIMONY OF ABDINASIR M. ABDULLE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/24/08
07-035-93
(15) SURREBUTTAL TESTIMONY OF RICHARD COLLINS In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/24/08
08-035-79
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Lund

09/25/08
08-035-38
(8) COMMENTS FROM DPU In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations

09/25/08
07-035-93
(15) SURREBUTTAL TESTIMONY OF WILLIAM R. GRIFFITH In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/25/08
08-027-01
(8) COMMENTS FROM DPU In the Matter of the Application of Flowell Electric Association, Inc., for Authority to Issue Securities in the Form of a Revolving Line of Credit Agreement and Related Documents

08/25/08
08-035-38
(5) APPENDIX A, Re: Kelly B. Mendenhall, Gary L. Robinson, Steven R. Bateson, Barrie L. McKay, Colleen Larkin Bell

09/29/08
08-2490-01
(5) STIPULATION In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for Certificates of Public Convenience and Necessity for the Milford Phase I and Phase II Wind Power Project

09/29/08
07-035-93
(5) STIPULATION IN COST OF SERVICE, RATE SPREAD AND RATE DESIGN - PHASE II In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/29/08
07-035-93
(5) MOTION FOR APPROVAL OF STIPULATION In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

09/29/08
07-035-22
(5) HEBER LIGHT & POWER COMPANY’S REPLY MEMORANDUM IN SUPPORT OF MOTION TO DISMISS FOR LACK OF SUBJECT MATTER JURISDICTION In the Matter of the Complaint of Rocky Mountain Power, a Division of PacifiCorp, Against Heber Light & Power Regarding Unauthorized Service By Heber Light & Power in Areas Certificated to Rocky Mountain Power

09/29/08
07-035-22
(5) DECLARATION OF BLAINE STEWART In the Matter of the Complaint of Rocky Mountain Power, a Division of PacifiCorp, Against Heber Light & Power Regarding Unauthorized Service by Heber Light & Power in Areas Certificated to Rocky Mountain Power

09/29/08
08-2496-01
(3) REPORTER’S TRANSCRIPT, Re: September 16, 2008 In the Matter of the Amended Application of Momentum Telecom, Inc., for a Certificate of Public Convenience and Necessity to Operate as a Competitive Local Exchange Carrier in Utah

09/29/08
08-035-38
(2) REPORTER’S TRANSCRIPT, Re: September 10, 2008 In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations

09/29/08
08-049-52
(1) FILING OF AMENDMENT TO AGREEMENT In the Matter of the Interconnection Agreement between Qwest Corporation and Veracity Communications, Inc.

09/29/08
08-049-53
(1) FILING OF AMENDMENT TO AGREEMENT In the Matter of the Interconnection Agreement between Qwest Corporation and Sprint Communications, LP

09/29/08
08-999-02
Re: 03-035-14
(8) COMMENTS FROM DPU, Re: Quarterly Compliance Filing – Avoided Cost Input Changes In the Matter of the Miscellaneous Electric Utility Correspondence and Reports Docket

09/29/08
08-2490-01
(1) COMMENTS FROM MILLARD COUNTY In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for a Certificate of Public Convenience and Necessity

09/30/08
08-057-12
(5) MOTION FOR PROTECTIVE ORDER In the Matter of Questar Gas Company’s Integrated Resource Plan for the Year: May 1, 2008 to April 30, 2009

09/29/08
NA
(5) NOTIFICATION OF THE TRANSFER OF CONTROL OF FIRST COMMUNICATIONS, LLC, TO RENAISSANCE ACQUISITION CORP. In the Matter of the Miscellaneous Telecommunications Docket

09/29/08
NA
(1) CONTACT INFORMATION UPDATE, Re: Level 3 Communications, LLC and its Carrier Affiliates In the Matter of the Miscellaneous Telecommunications Docket

09/30/08
08-049-39
(8) COMMENTS FROM DPU In the Matter of the Interconnection Agreement between Qwest Corporation and MCImetro Access Transmission

09/30/08
08-049-38
(8) COMMENTS FROM DPU In the Matter of the Interconnection Agreement between Qwest Corporation and McLeodUSA Telecommunications Services, Inc.

09/30/08
08-049-41
(8) COMMENTS FROM DPU In the Matter of the Interconnection Agreement between Qwest Corporation and TCG Utah

09/30/08
08-049-40
(8) COMMENTS FROM DPU In the Matter of the Interconnection Agreement between Qwest Corporation and AT&T Communications of the Mountain States, Inc.