05/01/08
07-057-13
(8) ERRATUM TESTIMONY AND EXHIBITS OF CHARLES E. PETERSON In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

05/01/08
07-035-94
(5) COMMENTS OF UTAH CLEAN ENERGY ON PACIFICORP’S REQUEST FOR PROPOSALS FINAL VERSION In the Matter of the Application of PacifiCorp, by and through its Rocky Mountain Power Division, for Approval of a Solicitation Process for a Flexible Resource for the 2012-2017 Time Period, and for Approval of a Significant Energy Resource Decision

05/01/08
07-035-94
(1) COMMENTS FROM THE SIERRA CLUB In the Matter of the Application of PacifiCorp, by and through its Rocky Mountain Power Division, for Approval of a Solicitation Process for a Flexible Resource for the 2012-2017 Time Period, and for Approval of a Significant Energy Resource Decision

05/01/08
08-049-20
(1) FILING OF AMENDMENT TO AGREEMENT In the Matter of the Interconnection Agreement Between Qwest Corporation and CommPartners, LLC

05/01/08
08-049-21
(1) FILING OF AMENDMENT TO AGREEMENT In the Matter of the Interconnection Agreement Between Qwest Corporation and New Cingular Wireless Services, Inc., f/k/a AT&T Wireless Services, Inc.

05/01/08
08-049-22
(1) FILING OF AMENDMENT TO AGREEMENT In the Matter of the Interconnection Agreement Between Qwest Corporation and TCG Utah

05/01/08
08-049-23
(1) AGREEMENT FILING In the Matter of the Interconnection Agreement Between Qwest Corporation and Access Point, Inc.

05/01/08
07-999-01
(1) PUBLIC COMMENT EMAIL FROM E. TAGGART In the Matter of the Petition for (801) Area Code Overlay & Abrogation and Recision of 801 Area Code Split Order

05/01/08
08-057-02
(15) QUESTAR GAS COMPANY INTEGRATED RESOURCE PLAN In the Matter of the Revision of Questar Gas Company’s Integrated Resource Planning Standards and Guidelines

05/02/08
08-057-11
(5) MOTION FOR PROTECTIVE ORDER In the Matter of the Consolidated Docket of Formal Complaints Against Questar Gas Company Relating to Back-Billing

05/02/08
08-035-40
(1) INFORMATIONAL FILING In the Matter of the Notice of Rocky Mountain Power of a 2008R-1 Request for Proposals (RFP)

05/02/08
07-057-13
(5) MOTION OF QUESTAR GAS TO STRIKE RATE OF RETURN REBUTTAL TESTIMONY OF ROGER J. BALL In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

05/02/08
07-057-13
(1) APPENDIX A, Re: Kelly B. Mendenhall

05/02/08
08-2480-01
(1) NOTICE OF NAME CHANGE In the Matter of the Notice of Name Change of Inter-Tel NetSolutions, Inc. to Mitel NetSolutions, Inc.

05/02/08
07-999-03
(1) APPENDIX A, Re: Philip Hayet

05/02/08
07-035-93
(1) APPENDIX A, Re: Roberta W. Wilson, Gary L. Cox, Ronald May

05/02/08
07-999-03
(1) APPENDIX A, Re: Randall J. Falkenberg

05/02/08
08-2495-01
(5) APPLICATION In the Matter of the Application of South Central Communications Telcom Service, LLC, For A Certificate of Public Convenience and Necessity to Provide Facilities-Based Local Exchange Service Within the State of Utah

05/02/08
07-035-50
(8) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used

05/02/08
07-999-01
(1) AT&T MEMO FOR CUSTOMERS In the Matter of the Petition for (801) Area Code Overlay & Abrogation and Recision of 801 Area Code Split Order

05/02/08
08-057-11
(1) EMAIL CORRESPONDENCE FROM ROGER BALL In the Matter of the the Investigation and the Consolidation of Dockets of the Formal Complaints against Questar Gas Company Relating to Back-Billing

05/05/08
04-049-145
(5) PETITION FOR RECONSIDERATION, REVIEW, AND REHEARING In the Matter of the Petition of Qwest Corporation for Arbitration of an Interconnection Agreement with Union Telephone Company d/b/a Union Cellular Under Section 252 of the Federal Telecommunications Act

05/05/08
04-049-145
(5) QWEST CORPORATION’S PETITION FOR CLARIFICATION AND RECONSIDERATION In the Matter of the Petition of Qwest for Arbitration of an Interconnection Agreement with Union Telephone Company d/b/a Union Cellular Under Section 252 of the Federal Telecommunications Act

05/05/08
08-035-40
(8) COMMENTS FROM DPU In the Matter of the Notice of Filing Rocky Mountain Power’s 2008R-1 Request for Proposals

05/06/08
07-035-94
(5) SUPPLEMENTAL FILING OF LS POWER ASSOCIATES, L.P. In the Matter of the Application of PacifiCorp, by and through its Rocky Mountain Power Division, for Approval of A Solicitation Process for a Flexible Resource for the 2012-2017 Time Period, and for Approval of a Significant Energy Resource Decision

05/06/08
08-049-19
(1) EMAIL CORRESPONDENCE In the Matter of the Formal Complaint of Crawford Against Qwest Corporation

05/06/08
08-999-01
(8) COMMENTS FROM DPU In the Matter of the 2008 Lifeline, Universal Service and Speech/Hearing Impaired Funds Status

05/06/08
86-999-08
(1) REQUEST FOR EXEMPTION, Re: LAST CHANCE LAKES HOME OWNERS ASSOCIATION In the Matter of the Water Companies Exemption Rule

05/06/08
NA
(1) BANKRUPTCY FILING, Re: Long Distance Billing Service, Inc. In the Matter of the Miscellaneous Telecommunications Docket

05/07/08
08-035-42
(1) PUBLIC COMMENTS In the Matter of the Application of Rocky Mountain Power for a Certificate of Convenience and Necessity Authorizing Construction of the Populous-to-Terminal 345 kV Transmission Line Project

05/07/08
08-035-25
(8) COMMENTS FROM DPU In the Matter of the Investigation into the Storm-Related Events of January 4-5, 2008

05/07/08
07-035-93
(1) APPENDIX A, Re: Byron Nielsen

05/08/08
07-035-69
(2) CORRESPONDENCE FROM ROCKY MOUNTAIN POWER In the Matter of the Formal Complaint of Harris Against Rocky Mountain Power

05/08/08
07-057-13
(1) CERTIFICATE OF SERVICE In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

05/08/08
NA
(1) ROCKY MOUNTAIN POWER UTAH SERVICE QUALITY REVIEW In the Matter of the Annual Report Docket

05/08/08
07-035-93
(5) MOTION OF ROCKY MOUNTAIN POWER TO STRIKE RATE OF RETURN DIRECT AND REBUTTAL TESTIMONY OF ROGER J. BALL In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/08/08
07-057-13
(1) CORRESPONDENCE FROM MAYOR WEBSTER, OF NEW HARMONY UTAH In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Costs Rates and Charges and Make Tariff Modifications

05/09/08
08-049-01
(1) MAY PAYMENTS In the Matter of the 2008 Qwest Performance Assurance Plan (QPAP)

05/09/08
07-035-93
(8) PRE-FILED REBUTTAL TESTIMONY OF JAMES B. DALTON In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/09/08
07-049-31
(8) COMMENTS FROM DPU In the Matter of Qwest Corporation’s Request for Approval of a Stipulation Regarding Certain Performance Indicator Definitions and Qwest Performance Assurance Plan

05/09/08
07-035-69
(2) REPORTER’S TRANSCRIPT, Re: April 24, 2008 In the Matter of the Formal Complaint of Harris Against Rocky Mountain Power

05/09/08
07-035-93
(15) ROCKY MOUNTAIN POWER’S REBUTTAL TESTIMONY AND EXHIBITS In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/09/08
07-035-93
(8) REBUTTAL TESTIMONY OF RANDALL J. FALKENBERG In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/09/08
07-035-93
(8) PRE-FILED REBUTTAL REVENUE REQUIREMENT TESTIMONY OF CHERYL MURRAY In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/09/08
08-035-35
(5) CORRESPONDENCE FROM ROCKY MOUNTAIN POWER In the Matter of the Request of Rocky Mountain Power for a Waiver of the Solicitation Process and for Approval of Significant Energy Resource Decision

05/09/09
08-057-11
(5) PETITION FOR LEAVE TO INTERVENE OF SALT LAKE COMMUNITY ACTION PROGRAM In the Matter of the Investigation and the Consolidation of Dockets of the Formal Complaints against Questar Gas Company Relating to Back-Billing

05/09/08
08-049-01
(1) STATEMENT OF ACCOUNT AS OF APRIL 30, 2008 In the Matter of the 2008 Qwest Performance Assurance Plan (QPAP)

05/12/08
08-2492-01
(8) COMMENTS FROM DPU In the Matter of the Application of North Fork Water Company for A Certificate of Public Convenience and Necessity to Operate as A Public Utility Rendering Culinary Water Service

05/12/08
08-035-42
(5) ERRATA TO SHARON L. SEPPI’S TESTIMONY AND APPLICATION In the Matter of the Application of Rocky Mountain Power for a Certificate of Convenience and Necessity Authorizing Construction of the Populous-to-Terminal 345 kV Transmission Line Project

05/12/08
NA
(1) PACIFICORP’S QUARTERLY REPORT ON FORM 10-Q FOR THE PERIOD ENDED MARCH 31, 2008 In the Matter of the Miscellaneous Annual Report Docket
05/12/08
07-057-13
(15) SURREBUTTAL TESTIMONY OF DR. J. RANDALL WOOLRIDGE In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

05/12/08
07-035-93
(15) SURREBUTTAL RATE OF RETURN TESTIMONY OF DANIEL J. LAWTON In the Matter of the Application of Rocky Mountain Power for Authority to Increase Its Retail Electric Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/12/08
07-057-13
(8) SURREBUTTAL TESTIMONY AND EXHIBITS OF CHARLES E. PETERSON In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

05/12/08
07-057-13
(8) PREFILED SURREBUTTAL TESTIMONY OF ROBERT H. MCKENNA In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

05/12/08
07-057-13
(8) PREFILED SURREBUTTAL TESTIMONY OF KEVIN C. HIGGINS In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

05/12/08
07-035-93
(8) SURREBUTTAL TESTIMONY AND EXHIBITS OF CHARLES E. PETERSON In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/12/08
07-057-13
(5) ROGER J. BALL’S RESPONSE TO QUESTAR GAS COMPANY’S MOTION TO STRIKE HIS RATE OF RETURN DIRECT TESTIMONY In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

05/12/08
07-057-13
(15) RATE OF RETURN SURREBUTTAL TESTIMONY OF ROGER J. BALL In the Matter of the Application fo Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

05/12/08
07-035-93
(15) RATE OF RETURN SURREBUTTAL TESTIMONY OF ROGER J. BALL In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and For Approval of Its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/13/08
08-2490-01
(5) SUBMISSION OF ADDITIONAL EXHIBIT TO APPLICATION FOR CERTIFICATES OF CONVENIENCE AND NECESSITY In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for Certificates of Convenience and Necessity for the Milford Phase I and Phase II Wind Power Project

05/13/08
08-035-35
(5) MOTION FOR ENTRY OF PROTECTIVE ORDER In the Matter of the Request of Rocky Mountain Power for Waiver of Solicitation Process and for Approval of Significant Energy Resource Decision

05/14/08
07-035-94
(2) REPORTER’S TRANSCRIPT, Re: May 1, 2008 In the Matter of the Application of PacifiCorp, by and through its Rocky Mountain Power Division, for Approval of a Solicitation Process for a Flexible Resource for the 2012-2017 Time Period, and for Approval of a Significant Energy Resource Decision

05/14/08
08-035-45
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Boyer

05/14/08
08-035-46
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Young

05/14/08
08-035-47
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Evans

05/14/08
05-035-47
07-035-94
08-035-35
08-035-40
(8) COMMENTS FROM DPU In the Matter of the Application of PacifiCorp for Approval of a 2009 Request for Proposals for Flexible Resource; In the Matter of the Application of PacifiCorp, by and Through its Rocky Mountain Power Division, for Approval of a Solicitation Process for a Flexible Resource for the 2012-2017 Time Period, and for Approval of a Significant Energy Resource Decision; In the Matter of the Request of Rocky Mountain Power for a Waiver of the Solicitation Process and for Approval of Significant Energy Resource Decision; and In the Matter of the Notice of Rocky Mountain Power for a 2008R-1 RFP (Request for Proposal)

05/15/08
08-2476-01
(1) REQUEST FOR MEDIATION In the Matter of the Request of Bresnan Broadband of Utah, LLC, for Mediation between Bresnan Broadband of Utah, LLC, and UBTA-UBET Communications, Inc.

05/15/08
07-049-60
(1) CORRESPONDENCE FROM QWEST In the Matter of the Formal Complaint of Patten & Lewis Against Qwest Corporation

05/15/08
07-999-01
(1) PUBLIC CORRESPONDENCE EMAIL FROM B. MCHARGUE In the Matter of the Petition for (801) Area Code Overlay & Abrogation and Recision of 801 Area Code Split Order

05/15/08
05-035-54
07-2035-02
(8) COMMENTS FROM DPU In the Matter of the Application of MidAmerican Energy Holdings Company and PacifiCorp for an Order Authorizing MidAmerican Energy Holdings Company to Exercise Substantial Influence Over the Policies and Actions of PacifiCorp; and In the Matter of the PacifiCorp Low-Income Arrearage Study Presented as Part of the Transaction Commitment In the MidAmerican Energy Holdings/ PacifiCorp Docket

05/15/08
08-035-48
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Rick Fuchs

05/15/08
08-035-49
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Houser

05/15/08
08-035-50
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Clotile & Louis Johnson

05/15/08
07-035-93
(5) CORRESPONDENCE FROM ROCKY MOUNTAIN POWER In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of $161.2 Million per Year, and for Approval of a New Large Load Surcharge

05/15/08
07-057-13
(5) MOTION OF QUESTAR GAS TO STRIKE RATE OF RETURN SURREBUTTAL TESTIMONY OF ROGER J. BALL In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

05/16/08
07-057-13
(5) REVENUE REQUIREMENT STIPULATION In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

05/16/08
08-035-38
(5) REQUEST TO SUBMIT FOR DECISION In the Matter of the Notice of Intent to File a General Rate Case on or Soon After June 6, 2008 by Rocky Mountain Power

05/19/08
04-049-145
(5) RESPONSE OF THE DIVISION OF PUBLIC UTILITIES TO UNION’S PETITION FOR REHEARING, RECONSIDERATION AND REVIEW In the Matter of the Petition of Qwest Corporation for Arbitration of an Interconnection Agreement with Union Telephone Company d/b/a Union Cellular Under Section 252 of the Federal Telecommunications Act

05/19/08
07-035-93
07-057-13
(1) EMAILED MEMORANDUM REGARDING ORDER OF WITNESSES FOR RATE OF RETURN HEARINGS In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of $161.2 Million per Year, and for Approval of a New Large Load Surcharge; and In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

05/19/08
07-035-93
(5) ROGER J. BALL’S RESPONSE MOTION TO ROCKY MOUNTAIN POWER’S MOTION TO STRIKE HIS RATE OF RETURN DIRECT & REBUTTAL TESTIMONY In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/19/08
08-057-11
(5) RESPONSE MOTION TO MOTION FOR PROTECTIVE ORDER In the Matter of the Investigation and the Consolidation of Dockets of the Formal Complaints against Questar Gas Company Relating to Back-Billing

05/20/08
NA
(1) GARKANE ENERGY 2007 ANNUAL REPORT In the Matter of the Miscellaneous Annual Report Docket

05/20/08
08-035-42
(1) PUBLIC COMMENT FROM THE ROBERTSONS In the Matter of the Application of Rocky Mountain Power for a Certificate of Convenience and Necessity Authorizing Construction of the Populous-to-Terminal 345 kV Transmission Line Project

05/20/08
04-049-145
(5) QWEST CORPORATION’S RESPONSE TO UNION CELLULAR’S PETITION FOR RECONSIDERATION, REVIEW AND REHEARING In the Matter of the Petition of Qwest Corporation for Arbitration of an Interconnection Agreement with Union Telephone Company d/b/a Union Cellular under Section 252 of the Federal Telecommunications Act

05/20/08
04-049-145
(5) UNION TELEPHONE COMPANY’S RESPONSE TO QWEST CORPORATION’S PETITION FOR CLARIFICATION AND RECONSIDERATION In the Matter of the Petition of Qwest Corporation for Arbitration of an Interconnection Agreement with Union Telephone Company d/b/a Union Cellular under Section 252 of the Federal Telecommunications Act

05/21/08
06-999-03
(5) ROCKY MOUNTAIN POWER FOSSIL FUEL ENERGY EFFICIENCY STANDARD PLAN In the Matter of the Consideration of the Amendment of 16 U.S.C.§ 2621 - Consideration and Determination Respecting Certain Ratemaking Standards for Electric Utilities by the Energy Policy Act of 2005

05/21/08
08-049-19
(8) COMMENTS FROM DPU In the Matter of the Formal Complaint of Crawford Against Qwest Corporation

05/21/08
08-2490-01
(1) REPORTER’S TRANSCRIPT, Re: May 13, 2008 In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for Certificates of Convenience and Necessity for the Milford Phase I and Phase II Wind Power Projects

05/22/08
08-049-18
(1) CORRESPONDENCE FROM ADAMS In the Matter of the Formal Complaint of Adams Against Qwest Corporation

05/22/08
08-049-18
(8) COMMENTS FROM DPU In the Matter of the Formal Complaint of Adams Against Qwest Corporation

05/22/08
07-035-93
(1) APPENDIX A, Re: Kevin Emerson

05/23/08
07-035-93
(8) SURREBUTTAL TESTIMONY OF BRENDA SALTER In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/23/08
07-035-93
(8) SURREBUTTAL TESTIMONY OF DAVID T. THOMSON In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/23/08
07-035-93
(8) PRE-FILED SURREBUTTAL TESTIMONY OF JAMES B. DALTON In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/23/08
07-057-13
(5) QUESTAR GAS COMPANY EXHIBIT CROSS 8 In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

05/23/08
07-035-93
(8) SURREBUTTAL TESTIMONY AND EXHIBITS OF MATTHEW CROFT In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/23/08
08-057-11
(1) CORRESPONDENCE FROM MR. FJELDSTED In the Matter of the Investigation and the Consolidation of Dockets of the Formal Complaints against Questar Gas Company Relating to Back-Billing

05/23/08
07-035-93
(5) JOINT ISSUES LIST In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/23/08
07-035-93
(8) SURREBUTTAL TESTIMONY OF MARK E. GARRETT In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/23/08
07-035-93
(8) SURREBUTTAL TESTIMONY OF RANDALL J. FALKENBERG In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/23/08
07-035-93
(15) PRE-FILED SURREBUTTAL TESTIMONY OF HELMUTH W. SCHULTZ, III In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/23/08
07-035-93
(15) PRE-FILED SURREBUTTAL TESTIMONY OF THOMAS C. BRILL In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/23/08
07-035-93
(15) SURREBUTTAL TESTIMONY OF MAURICE BRUBAKER In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/23/08
07-035-93
(15) PREFILED SURREBUTTAL TESTIMONY OF KEVIN C. HIGGINS In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/23/08
07-035-93
(15) SURREBUTTAL TESTIMONY/EXHIBITS OF GARY COX In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/23/08
07-035-93
(15) PRE-FILED SURREBUTTAL REVENUE REQUIREMENT TESTIMONY OF CHERYL MURRAY In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/23/08
07-035-93
(15) PRE-FILED SURREBUTTAL TESTIMONY OF DONNA DERONNE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/23/08
04-049-145
(5) UNION TELEPHONE COMPANY’S RESPONSE TO QWEST CORPORATION’S PETITION FOR CLARIFICATION AND RECONSIDERATION In the Matter of the Petition of Qwest Corporation for Arbitration of an Interconnection Agreement with Union Telephone Company d/b/a Union Cellular Under Section 252 of the Federal Telecommunications Act

05/23/08
08-049-19
(5) QWEST CORPORATION’S MOTION TO DISMISS AND MEMORANDUM IN SUPPORT OF MOTION TO DISMISS In the Matter of the Formal Complaint of Crawford Against Qwest Corporation

05/23/08
NA
(1) DECLARATION OF CASH DIVIDEND In the Matter of the Miscellaneous Gas Docket

05/23/08
08-049-24
(1) FILING OF WIRELINE ADOPTION INTERCONNECTION AGREEMENT In the Matter of the Interconnection Agreement Between Qwest Corporation and Pac-West Telecomm, Inc.

05/23/08
08-2476-01
(5) RESPONSE OF UBTA-UBET In the Matter of Request of Bresnan Broadband of Utah, LLC, for Mediation between Bresnan Broadband of Utah, LLC, and UBTA-UBET Communications, Inc.

05/27/08
07-035-93
(8) CORRECTED PAGE 9 OF MARK E. GARRETT’S TESTIMONY In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/27/08
07-035-93
(2) NOTICE OF PETER EELKEMA’S ADOPTION OF PRE-FILED DIRECT TESTIMONY OF G. MICHAEL RIFE ON ROCKY MOUNTAIN POWER’S LOAD FORECAST In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/27/08
07-035-93
(2) NOTICE OF INTENT TO PRESENT SUR-SURREBUTTAL TESTIMONY IN REVENUE REQUIREMENT HEARING COMMENCING JUNE 2, 2008 In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/27/08
08-999-01
(1) COMMENTS FROM DPU In the Matter of the 2008 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status

05/27/08
08-094-01
(1) PETITION FOR REVIEW OF A DECISION OF THE POOLING ADMINISTRATOR In the Matter of the Petition of Sprint Communications Company L.P. for Review of a Decision of the Pooling Administrator

05/27/08
07-999-01
(1) PUBLIC COMMENT EMAIL FROM R. CHRISTOPHERSON In the Matter of the Petition for (801) Area Code Overlay & Abrogation and Recision of 801 Area Code Split Order

05/27/08
08-066-01
(8) COMMENTS FROM DPU In the Matter of the Application of Dixie-Escalante Rural Electric Association, Inc., for Authority to Issue Securities in the Form of a Secured Promissory, a Revolving Line of Credit Agreement and Related Documents

05/27/08
08-049-19
(1) PLAINTIFF’S REPLY TO DEFENDANT’S MOTION TO DISMISS In the Matter of the Formal Complaint of Crawford Against Qwest Corporation

05/27/08
08-999-03
(1) QUESTAR GAS’S CUSTOMER SATISFACTION STANDARDS REPORT In the Matter of the Miscellaneous Gas Docket

05/28/08
07-049-60
(1) CORRESPONDENCE FROM THE PATTENS In the Matter of the Formal Complaint of Patten and Lewis Against Qwest Corporation

05/28/08
07-035-93
(8) SUPPLEMENTAL SURREBUTTAL TESTIMONY AND EXHIBIT OF THOMAS C. BRILL In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/28/08
08-035-42
(1) PUBLIC COMMENT EMAIL FROM E. IRVIN In the Matter of the Application of Rocky Mountain Power for a Certificate of Convenience and Necessity Authorizing Construction of the Populous-to-Terminal 345 kV Transmission Line Project

05/28/08
07-057-13
(1) EMAIL CORRESPONDENCE In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Costs Rates and Charges and Make Tariff Modifications

05/28/08
08-999-02
Re: 07-035-16
(5) QUARTERLY FINANCING ACTIVITY REPORT In the Matter of the Miscellaneous Electric Utility Correspondence and Reports Docket

05/29/08
07-035-93
(15) SUPPLEMENTAL SURREBUTTAL TESTIMONY / EXHIBITS OF GARY COX In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/29/08
07-999-01
(1) PUBLIC COMMENT EMAIL FROM W. BORNEMEIER In the Matter of the Petition for (801) Area Code Overlay & Abrogation and Recision of 801 Area Code Split Order

05/29/08
08-049-25
(1) AGREEMENT FILING In the Matter of the Interconnection Agreement between Qwest Corporation and XO Communications Services, Inc.

05/29/08
08-999-02
Re: 05-035-54
(5) CY 2007 AFFILIATED INTEREST REPORT In the Matter of the Miscellaneous Electric Utility Correspondence and Reports Docket

05/30/08
08-999-02
Re: 05-035-54
(5) COMPLIANCE FILING PURSUANT TO COMMITMENT 49 OF STIPULATION A, CONSOLIDATED LIST OF COMMITMENTS In the Matter of the Miscellaneous Electric Utility Correspondence and Reports Docket

05/30/08
07-035-93
(5) OBJECTION TO THE PRESENTATION OF SUR-SURREBUTTAL TESTIMONY AND EXHIBITS In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/30/08
08-057-02
(5) COMMENTS OF QUESTAR GAS COMPANY ON DRAFT STANDARDS AND GUIDELINES In the Matter of the Revision of Questar Gas Company’s Integrated Resource Planning Standards and Guidelines

05/30/08
08-057-02
(5) COMMENTS FROM CCS In the Matter of the Revision of Questar Gas Company’s Integrated Resource Planning Standards and Guidelines

05/30/08
08-057-02
(8) COMMENTS FROM DPU In the Matter of the Revision of Questar Gas Company’s Integrated Resource Planning Standards and Guidelines

05/30/08
07-035-93
(15) SUPPLEMENTAL REBUTTAL TESTIMONY OF JONATHAN D. HALE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

05/30/08
08-2351-01
(5) AMENDED NOTICE OF CORPORATE NAME CHANGE In the Matter of the Notification of Time Warner Telecom of a Name Change to tw telecom

05/30/08
08-999-02