07/01/08
08-2490-01
(5) MEMORANDUM IN OPPOSITION TO PETITION FOR REHEARING In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for Certificates of Convenience and Necessity for the Milford Phase I and Phase II Wind Power Projects

07/01/08
08-049-31
(1) FILING OF AMENDMENT TO AGREEMENT In the Matter of the Interconnection Agreement Between Qwest Corporation and XO Communications Services, Inc.

07/01/08
08-057-15
(1) PUBLIC COMMENT EMAILS FROM S. LACY, S. PITKIN, M. GAGNON In the Matter of the -Through Application of Questar Gas Company For An Adjustment In Rates and Charges For Natural Gas Service In Utah

07/02/08
08-057-11
(8) COMMENTS FROM DPU In the Matter of the Consolidated Docket of Formal Complaints Against Questar Gas Company Related to Back-Billing

07/02/08
07-2419-01
(8) STIPULATION In the Matter of the Petition of Direct Communications Cedar Valley, LLC, for a Rebalance of Rates and Support from the State Universal Service Support Fund

07/02/08
08-999-01
(8) COMMENTS FROM DPU In the Matter of the 2008 Lifeline, Universal Service and Speech/Hearing-Impaired Funds Status

07/02/08
08-049-18
(1) CORRESPONDENCE FROM QWEST In the Matter of the Formal Complaint of Adams Against Qwest Corporation

07/02/08
07-057-01
(5) QUESTAR GAS COMPANY’S CONFIDENTIAL IRP SECOND QUARTER VARIANCE REPORT AND THIRD QUARTER VARIANCE REPORT In the Matter of the Filing of Questar Gas Company’s Integrated Resource Plan for Plan Year: May 1, 2007 to April 30, 2008

07/02/08
08-035-50
(2) REPORTER’S TRANSCRIPT, Re: June 19, 2008 In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Johnson

07/02/08
08-035-46
(2) REPORTER’S TRANSCRIPT, Re: June 19, 2008 In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Young

07/02/08
08-035-47
(2) REPORTER’S TRANSCRIPT, Re: June 19, 2008 In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Evans

07/03/08
08-2263-01
(1) FORMAL COMPLAINT In the Matter of the Formal Complaint of A-Allstate Bonding Company Against Eschelon Telecom Inc./ Integra Telecom

07/03/08
08-049-29
(1) EMAIL CORRESPONDENCE In the Matter of the Qwest Corporation Petition for Commission Approval of 2008 Additions to Non-Impaired Wire Center List

07/03/08
08-049-29
(1) APPENDIX A & B, Re: William S. Duncan, Dennis Miller, Casey J. Coleman

07/03/08
08-2495-01
(8) COMMENTS FROM DPU In the Matter of the Application of South Central Communications Telcom Service, LLC, for a Certificate of Public Convenience and Necessity to Provide Facilities-Based Local Exchange Service Within the State of Utah

07/07/08
08-049-01
(1) STATEMENT OF ACCOUNT AS OF JUNE 30, 2008 In the Matter of the 2008 Qwest Performance Assurance Plan (QPAP)

07/07/08
08-049-01
(1) JULY PAYMENTS In the Matterof the 2008 Qwest Performance Assurance Plan (QPAP)

07/07/08
08-049-29
(1) APPENDIX A, Re: Douglas Denney

07/07/08
07-057-13
(3) REPORTER’S TRANSCRIPT, Re: June 12, 2008 In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Rates and Charges and Make Tariff Modifications

07/07/08
08-057-12
(8) COMMENTS FROM CCS In the Matter of the Questar Gas Company’s Integrated Resource Plan (IRP) for Plan Year May 1, 2008 to April 30, 2009

07/07/08
07-999-01
(1) PUBLIC COMMENT EMAIL FROM K. SMITH In the Matter of the Petition for (801) Area Code Overlay & Abrogation and Recision of 801 Area Code Split Order

07/07/08
08-057-12
(8) COMMENTS FROM DPU In the Matter of the Questar Gas Company’s Integrated Resource Plan (IRP) for Plan Year May 1, 2008 to April 30, 2009

07/07/08
08-057-14
(5) STIPULATION AND JOINT MOTION TO DISMISS In the Matter of the Formal Complaint of Hemple Against Questar Gas Company

07/07/08
08-057-18
(8) MOTION OF QUESTAR GAS COMPANY FOR STAY OF PROCCEDINGS AND FOR ENLARGEMENT OF TIME TO RESPOND TO COMPLAINT In the Matter of the Complaint of Slattery Against Questar Gas Company

07/08/08
08-035-42
(1) PUBLIC COMMENT EMAIL FROM B. PRICE In the Matter of the Application of Rocky Mountain Power for a Certificate of Convenience and Necessity Authorizing Construction of the Populous-to-Terminal 345 kV Transmission Line Project

07/08/08
08-057-19
Re: 08-057-11
(1) COMPLAINT In the Matter of the Complaint of Stella Against Questar Gas Company, Related to Back-Billing

07/08/08
08-999-02
(1) CORRESPONDENCE FROM DPU TO ROCKY MOUNTAIN POWER, Re: Deferred Tax Normalization In the Matter of the Miscellaneous Electric Utility Correspondence and Reports Docket

07/08/08
08-999-02
(1)_CORRESPONDENCE FROM DPU TO ROCKY MOUNTAIN POWER, Re: Demand Side Management Program In the Matter of the Miscellaneous Electric Utility Correspondence and Reports Docket

07/08/08
07-999-01
(1) PUBLIC COMMENT EMAIL FROM J. MILLER In the Matter of the Petition for (801) Area Code Overlay & Abrogation and Recision of 801 Area Code Split Order

07/09/08
08-049-29
(5) APPENDIX A AND APPENDIX B, Re: Douglas Denney, Dale Perry

07/09/08
07-999-01
(1) PUBLIC COMMENT EMAIL FROM H. SHEARER In the Matter of the Petition for (801) Area Code Overlay & Abrogation and Recision of 801 Area Code Split Order

07/09/08
08-049-26
(1) APPENDIX A, Re: Peggy N. Egbert, William S. Duncan, Dennis Miller, Paul M. Anderson

07/09/08
08-2496-01
(1) APPENDIX A, Re: William S. Duncan, Dennis Miller, Casey J. Coleman

07/10/08
07-2419-03
(8) COMMENTS FROM CCS In the Matter of the Petition of Direct Communications Cedar Valley, LLC, for a Rebalance of Rates and Support from the State Universal Service Support Fund

07/11/08
08-035-35
(8) COMMENTS FROM DPU In the Matter of the Verified Request for Waiver of Solicitation Process and for Approval of Significant Energy Resource Decision

07/11/08
08-035-35
(8) COMMENTS FROM DPU In the Matter of the Verified Request for Waiver of Solicitation Process and for Approval of Significant Energy Resource Decision

07/11/08
08-035-35
(5) REBUTTAL COMMENTS OF ROCKY MOUNTAIN POWER In the Matter of the Request of Rocky Mountain Power for Waiver of Solicitation Process and for Approval of Significant Energy Resource

07/11/08
07-057-13
(1) PUBLIC COMMENT FROM R. HAWKES In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Costs Rates and Charges and Make Tariff Modifications

07/11/08
08-999-01
(1) QWEST’S LIFELINE REPORTS, REQUEST FOR REIMBURSEMENT In the Matter of the Lifeline, Universal Service and Hearing-Impaired Funds Status; 2008

07/11/08
07-2419-03
(2) REPORTER’S TRANSCRIPT, Re: July 10, 2008 In the Matter of the Petition of direct Communications Cedar Valley, LLC, for a Rebalance of Rates and Support from the State Universal Service Support Fund.

07/14/08
07-057-13
(5) CORRESPONDENCE FROM QUESTAR GAS COMPANY In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Costs Rates and Charges and Make Tariff Modifications

07/14/08
08-2496-01
(1) APPENDIX A, Re: Kira M. Slawson, Stanley K. Stoll, Paul M. Anderson

07/14/08
08-049-26
(1) APPENDIX A, Re: Kira M. Slawson, Stanley K. Stoll, Tony DiStefano

07/14/08
08-999-02
(1) CORRESPONDENCE FROM DPU TO ROCKY MOUNTAIN POWER In the Matter of the Miscellaneous Electric Utility Correspondence and Reports Docket

07/15/08
05-049-69
(1) RESPONSE TO PETITION DENIAL ETC. In the Matter of the Formal Complaint of Low vs. Qwest Corporation

07/15/08
08-049-29
(1) APPENDIX A AND APPENDIX B, Re: Paul M. Anderson, Peggy N. Egbert

07/15/08
08-2496-01
(1) APPENDIX A, Re: Darren Woolsey, Brock Johansen

07/15/08
08-2498-01
(5) APPLICATION In the Matter of the Application of Canaan Springs Water Company for a Certificate of Public Convenience and Necessity

07/15/08
08-057-15
08-057-16
08-057-17
(2) REPORTER’S TRANSCRIPT, Re: June 30, 2008 In the Matter of the Pass-Through Application of Questar Gas Company for an Adjustment in Rates and Charges for Natural Gas Service in Utah; In the Matter of the Application of Questar Gas Company to Amortize the Conservation Enabling Tariff Balancing Account; and In the Matter of the Application of Questar Gas Company to Amortize the Demand Side Management Deferred Account Balance

07/15/08
08-049-32
(1) FILING OF AMENDMENT TO AGREEMENT In the Matter of the Interconnection Agreement between Qwest Corporation and 360Networks (USA) Inc.

07/15/08
NA
(1) CONTACT INFORMATION UPDATE, Re: STi Prepaid, LLC IN the Matter of the Miscellaneous Telecommunications Docket

07/15/08
08-035-57
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Milewski

07/15/08
08-035-58
(1) COMMENTS FROM DPU In the Matter of the Termination of Electronic Service Where Life Support Equipment is Used: Klinetop

07/16/08
08-035-35
(1) APPENDIX A, Re: Gary A. Dodge, Ronald J. Day

07/16/08
08-2495-01
(8) ATTACHMENT TO DPU COMMENTS OF 07/03/08 IN the Matter of the Application of South Central Communications Telecom Services, LLC, for a Certificate of Public Convenience and Necessity to Provide Facilities-Based Local Exchange Service Within the State of Utah

07/16/08
08-035-59
(1) COMMENTS FROM DPU IN the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Buttars

07/17/08
08-035-38
(15) APPLICATION In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations

07/17/08
08-035-38
(1) PUBLIC COMMENT EMAIL FROM C. GLEED In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations

07/18/08
08-057-11
(8) COMMENTS FROM DPU In the Matter of the Investigation and the Consolidation of Dockets of the Formal Complaints Against Questar Gas Company Relating to Back-Billing

07/18/08
NA
(1) NOTIFICATION BY TELECOM MANAGEMENT, INC., d/b/a PIONEER TELEPHONE AND BROADWING COMMUNICATIONS, LLC, FOR APPROVAL OF AN ASSET PURCHASE AGREEMENT In the Matter of the Miscellaneous Telecommunications Docket

07/18/08
07-2263-03
(5) ARBITRATOR’S DECISION APPROVED WITH MODIFICATIONS IN THE OREGON ARBITRATION In the Matter of the Petition of Eschelon Telecom of Utah, Inc., for Arbitration with Qwest Corporation, Pursuant to 47 U.S.C. Section 252 of the Federal Telecommunications Act of 1996

07/18/08
08-035-42
(5) REQUEST TO INTERVENE OF WILLARD CITY In the Matter of the Application for Approval of a Certificate of Convenience and Necessity Authorizing Construction fo the Populus to Terminal 345 kV Transmission Line Project

07/18/08
08-2499-01
(5) APPLICATION In the Matter of the Application of Maskina Communications, Inc., f/k/a Transcom Communications, Inc., for Authority to Provide Facilities-Based Interexchange Telecommunications Services in the State of Utah

07/18/08
08-2476-02
(5) PETITION TO RESOLVE DISPUTE OVER INTERCONNECTION OF ESSENTIAL FACILITIES AND PETITION FOR ARBITRATION In the Matter of the Petitions of Bresnan Broadband of Utah, LLC, to Resolve Dispute Over Interconnection of Essential Facilities and for Arbitration to Resolve Issues Relating to an Interconnection Agreement with UBTA-UBET Communications, Inc.

07/18/08
08-999-02
(3) SOLE SOURCE CONTRACT WITH HAMON-CUSTODIS TO PREFORM EXPEDITED REPAIRS OF HUNTER UNIT #3 CHIMNEY In the Matter of the Miscellaneous Electric Utility Correspondence and Reports Docket

07/18/08
08-035-38
(5) ROCKY MOUNTAIN POWER DECEMBER 2007 LEAD/LAG STUDY In the Matter of the Miscellaneous Electric Utility Correspondence and Reports Docket

07/21/08
08-057-11
(8) APPENDIX A TO DPU REPORT In the Matter of the Investigation and the Consolidation of Dockets of the Formal Complaints Against Questar Gas Company Relating to Back-Billing

07/21/08
07-035-93
(15) PREFILED DIRECT TESTIMONY OF KEVIN C. HIGGINS In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

07/21/08
07-035-93
(15) PREFILED DIRECT TESTIMONY OF STEVE W. CHRISS In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

07/21/08
07-035-93
(15) DIRECT TESTIMONY OF CHARLES E. JOHNSON In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

07/21/08
07-035-93
(15) TESTIMONY OF MARK DRAZEN In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

07/21/08
07-035-93
(15) PRE-FILED DIRECT COST-OF-SERVICE TESTIMONY OF DANIEL E. GIMBLE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

07/21/08
07-035-93
(15) DIRECT TESTIMONY AND SCHEDULES OF MAURICE BRUBAKER In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

07/21/08
07-035-93
(15) DIRECT TESTIMONY OF PAUL CHERNICK In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

07/21/08
07-035-93
(15) DIRECT TESTIMONY OF ALAN CHALFANT In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

07/21/08
07-035-93
(15) PREFILED TESTIMONY OF MICHAEL MENDELSOHN In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

07/21/08
07-035-93
(15) PRE-FILED DIRECT TESTIMONY OF RICHARD COLLINS In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

07/21/08
07-035-93
(15) PREFILED DIRECT TESTIMONY OF ABDINASIR M. ABDULLE IN the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

07/21/08
08-035-38
(1) PUBLIC COMMENT EMAIL FROM R. DERRICK In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations

07/21/08
08-049-33
(1) FILING OF AMENDMENT TO AGREEMENT In the Matter of the Interconnection Agreement between Qwest Corporation and First Digital Telecom

07/21/08
08-049-34
(1) AGREEMENT FILING In the Matter of the Interconnection Agreement Between Qwest Corporation and ACN Communications Services, Inc.

07/21/08
08-035-60
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Taifua

07/21/08
08-035-61
(1) COMMENTS FROM DPU In the Matter of the Termination of Electric Service Where Life Support Equipment is Used: Laititi

07/22/08
08-035-38
(5) QUESTAR GAS COMPANY’S PETITION TO INTERVENE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations

07/22/08
08-2490-01
(5) PETITION FOR REHEARING OR REQUEST FOR RECONSIDERATION OF ORDER ON PETITION FOR REHEARING In the Matter of the Application of Milford Wind Corridor Phase I, LLC and Milford Wind Corridor Phase II, LLC for Certificates of Convenience and Necessity for the Milford Phase I and Phase II Wind Power Project

07/22/08
08-2496-01
(5) VERIFIED AMENDED APPLICATION In the Matter of the Application of Momentum Telecom, Inc., for a Certificate of Public Convenience and Necessity to Operate as a Competitive
Local Exchange Carrier in Utah

07/22/08
08-049-31
(8) COMMENTS FROM DPU In the Matter of the Interconnection Agreement between Qwest Corporation and XO Communications Services, Inc.

07/22/08
08-049-30
(8) COMMENTS FROM DPU In the Matter of the Interconnection Agreement between Qwest Corporation and WilTel Local Network, LLC

07/22/08
08-049-24
(8) COMMENTS FROM DPU In the Matter of the Interconnection Agreement between Qwest Corporation and Pac-West Telecomm, Inc.

07/22/08
08-049-31
(8) COMMENTS FROM DPU In the Matter of the Interconnection Agreement Between Qwest Corporation and XO Communications Services, Inc.

07/22/08
07-999-01
(1) PUBLIC COMMENT EMAIL FROM M. BITTON In the Matter of the Petition for (801) Area Code Overlay & Abrogation and Recision of 801 Area Code Split Order

07/23/08
07-057-13
(1) PUBLIC COMMENTS FROM THE MOLINARO’S In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Costs Rates and Charges and Make Tariff Modifications

07/25/08
07-035-93
(15) DIRECT TESTIMONY AND EXHIBITS OF STEPHEN J. BARON In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations, Consisting of a General Rate Increase of Approximately $161.2 Million Per Year, and for Approval of a New Large Load Surcharge

07/25/08
08-035-38
(10) KROGER CO. COMPANY’S PETITION TO INTERVENE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations

07/25/08
08-035-38
(5) REQUEST TO INTERVENE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations

07/25/08
07-057-13
(5) UPDATED COST OF SERVICE MODEL AND TARIFF SHEETS In the Matter of the Application of Questar Gas Company to Increase Distribution Non-Gas Costs Rates and Charges and Make Tariff Modifications

07/25/08
08-2490-01
(5) MOTION FOR ENTRY OF PROTECTIVE ORDER In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for Certificates of Convenience and Necessity for the Milford Phase I and Phase II Wind Power Project

07/25/08
08-999-04
(1) STATE CERTIFICATION OF CITIZENS TELECOMMUNICATIONS COMPANY OF UTAH, d/b/a FRONTIER COMMUNICATIONS OF UTAH In the Matter of the State Certification of Rural Carriers’ Compliance with 47 U.S.C. Section 245(e); 2008

07/25/08
08-999-04
(1) STATE CERTIFICATION OF NAVAJO COMMUNICATIONS COMPANY, INC. In the Matter of the State Certification of Rural Carriers’ Compliance with 47 U.S.C. Section 254(e); 2008

07/25/08
08-999-01
(8) COMMENTS FROM DPU, Re: Lifeline Reimbursement for Gunnison Telephone Company In the Matter of the 2008 Universal Service and Speech/Hearing-Impaired Funds Status

07/28/08
08-035-38
(8) PETITION TO INTERVENE OF WAL-MART SORES, INC. In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of Its Proposed Electric Service Schedules and Electric Service Regulations

07/28/08
08-035-38
(8) NOTICE OF APPEARANCE OF AN ATTORNEY LICENSED IN A FOREIGN STATE In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and For Approval of Its Proposed Electric Service Schedules and Electric Service Regulations

07/28/08
08-2490-01
(5) PRELIMINARY POSITION STATEMENT OF INTERVENOR UTAH ASSOCIATED MUNICIPAL POWER SYSTEM In the Matter of the Application of Milford Wind Corridor Phase I, LLC, and Milford Wind Corridor Phase II, LLC, for Certificates of Public Convenience and Necessity for Phase I and Phase II of the Milford Wind Power Project

07/28/08
08-035-38
(5) PETITION TO INTERVENE OF THE UTAH INDUSTRIAL ENERGY CONSUMERS In the Matter of the Application of Rocky Mountain Power for Authority to Increase its Retail Electric Utility Service Rates in Utah and for Approval of its Proposed Electric Service Schedules and Electric Service Regulations